Solutions
Industry Solutions
AI-powered solutions for clean energy, smart cities, telecom infrastructure, and precision agriculture
Solutions
AI-powered solutions for clean energy, smart cities, telecom infrastructure, and precision agriculture

Verified SOLAR TODO case: a 25 m FRP composite power transmission pole for 110 kV, class_2 wind and 200 m span is supplied globally at exactly $2,829 turnkey per structure, with FOB $0 and CIF $0, providing a clear benchmark for utilities and EPCs planning sub-transmission upgrades.

SOLAR TODO’s 30 m, 110 kV single‑circuit steel power transmission tower for a 100 m span in wind class 2 is delivered at a verified turnkey price of $25,009 per tower, with FOB and CIF both $0. This case study explains configuration, three‑tier pricing, and procurement use.

A 90-unit SOLAR TODO Solar Streetlight project in Global delivers 30W LEDs on 6m poles with mono PERC panels and LFP batteries at a fixed $15,806 turnkey price. FOB and CIF are $0, with local motion/timer/dimming controls optimized for temperate climates and off-grid operation.

A subtropical municipality deployed 568 SOLAR TODO solar streetlights (30W LED, 50W mono PERC, 450Wh LFP) for $82,370 turnkey, achieving 155,490 kWh annual savings, 77,745 kg CO₂ reduction, and a 5.3-year payback over a 12-year system lifespan with 6m galvanized poles at 18m spacing.

A 5.6 km SOLAR TODO smart streetlight corridor with 188 grid-powered poles (12 m, 200 W LEDs) delivers 5,640,000 lm and consumes 353,393 kWh/year. With $817,499 turnkey CAPEX and $93,387 annual OPEX, it integrates 8 smart modules per pole and achieves 20% energy savings vs traditional lighting.

A 90 kW industrial solar PV + 1,030 kWh storage system in Mexico delivers 150,719 kWh/year at 19.1% capacity factor, with $97,218 turnkey PV cost and $226,600 storage. It achieves $0.023/kWh LCOE, $13,614 annual savings, 7.1‑year payback, and $252,769 lifetime savings while avoiding 63.3 tons CO₂/year.

A 21-tower, 45 m, 500 kV dead-end steel lattice transmission system in Lusail, Qatar is delivered by SOLAR TODO at $3,577,072 turnkey, with $2,325,097 FOB and $2,861,657 CIF options, achieving $715,414 annual savings, a 5-year payback, 400 m spans, and 50-year IEC 60826-compliant design life.

Case study of a 2,580-unit SOLAR TODO solar streetlight project in Milan’s highland zone: 30W, 4,500 lm poles with 7-day autonomy and 1,490 Wh LFP batteries. Turnkey cost is $608,550, delivering 706,275 kWh and 353,138 kg CO₂ savings per year with an 8.6-year payback over a 12-year lifespan.

Astana’s 210-pole SOLAR TODO solar streetlight project covers 5,040 m of road with 60W, 9,000 lm luminaires and 8 m poles. At a $89,783 turnkey price, it saves 114,975 kWh and $13,797 annually, achieves 7.8-year payback, and cuts CO₂ emissions by 57,488 kg each year over a 12-year lifespan.

Global smart streetlight case: 201 grid-powered, 10m smart poles over 10km, each 200W LED and 495W total load, delivering 6,030,000 lm and 363,157 kWh/year. Three-tier pricing: $546,558 FOB, $672,687 CIF, $840,859 turnkey including installation and commissioning.

Verified 110kV FRP composite distribution line: 32 × 18m poles, 200m spans, Class 2 wind (30 m/s, 1.7 kN), delivered at $46,889 FOB, $57,710 CIF or $72,137 turnkey, achieving 1-year payback and $89,040 annual savings for international projects via FOB Singapore.

A 50kW/100kWh LFP commercial energy storage system with 95% efficiency and 8,000+ cycles delivers 4 hours of backup. At a $33,642 turnkey price in the U.S., it achieves 5.5-year payback, $6,143 net annual savings, and $29,021 lifetime savings for C&I backup and peak shaving.