We facilitate, you win the project
GLOBAL INFRASTRUCTURE PARTNER
Our Core Competencies
We provide government relations, project financing, SINOSURE coverage, and turnkey EPC services to help you win and execute projects across Belt & Road countries.
Government Relations
We facilitate, you win the project
- Access to decision-makers in 150+ BRI countries
- Public procurement channels & tender intelligence
- Local policy interpretation & compliance support
- High-level business matchmaking & introductions
SINOSURE Coverage
State-backed export credit insurance
- Political risk + commercial risk dual coverage
- Up to 95% loss compensation guarantee
- Maximum 20-year insurance tenor
- Accelerated receivables recovery
Project Financing
Flexible financing solutions for your projects
- Preferential rates from partner banks
- Project finance & structured finance
- Buyer's credit & supplier's credit
- Up to 20-year extended repayment terms
Turnkey EPC
Complete project delivery, ready to operate
- Engineering + Procurement + Construction
- Single point of responsibility & accountability
- Fixed-price contracts to manage cost risk
- Ready-to-operate facility upon handover
Let us help you build connections and access project opportunities in your target markets
Our Products
Product Categories
8 AI-integrated product lines: Solar PV, Energy Storage, Smart Streetlight, Solar Streetlight, Telecom Tower, Power Tower, Security System, Smart Agriculture
Solar PV Systems
Complete photovoltaic systems with panels, inverters and mounting.
View AllEnergy Storage
LFP batteries, inverters and complete ESS systems.
View AllSmart Streetlight
10-in-1 integrated smart poles for smart cities.
View AllSolar Streetlight
Off-grid lighting with integrated solar and batteries.
View AllSecurity Systems
Alarms, cameras and access control with solar backup.
View AllTelecom Towers
Towers for 4G/5G base stations and communication.
View AllPower Transmission Towers
Steel towers for high voltage transmission lines.
View AllSmart Agriculture
Weather, soil and pest monitoring systems.
View AllAI-POWERED INTELLIGENT TRANSPORTATION
Next-Gen Smart Traffic System
45+ AI detection capabilities with <50ms response time. Solar-powered, BOT zero-investment model — governments deploy now, pay from revenue later.
Smart Traffic AI Foundation Model
4-layer intelligent architecture: from road perception to real-time decision-making
BOT BOT Model: Zero upfront cost for governments. We build, operate & transfer — you pay only from traffic revenue.
Configurator
Product Configurators
Configure your system requirements and get instant professional proposals with our intelligent configurators
Solar PV System
Design your solar power system based on location, capacity requirements, and optional energy storage integration.
- Location-based solar irradiance data
- System capacity optimization
- Optional battery storage add-on
- Instant ROI & payback estimate
Energy Storage System
Configure battery storage solutions for peak shaving, backup power, or energy arbitrage applications.
- LFP battery type selection
- Capacity & power sizing
- Application scenario matching
- Total cost of ownership estimate
Smart Streetlight
Build your 10-in-1 smart city infrastructure with LED lighting, surveillance, environmental sensors, and 5G connectivity.
- Illumination level configuration
- Smart module selection (CCTV, WiFi, LED screen)
- Intelligent control system setup
- Complete system quotation
Solar Streetlight
Design off-grid solar streetlighting systems with optimized PV panel, battery, and LED configurations.
- Solar panel capacity sizing
- Battery autonomy configuration
- LED power & lighting mode
- Pole height & material selection
Security System
Configure comprehensive security solutions with sensors, cameras, alarm systems, and intelligent intruder detection.
- Sensor & detector selection (10+ types)
- Camera system configuration
- Alarm & notification setup
- Hybrid power system (Solar + Grid)
Telecom Tower
Design telecommunications tower infrastructure with optimized height, material, and equipment capacity specifications.
- Tower height & type selection
- Material & structural design
- Equipment loading capacity
- Construction cost estimation
Power Transmission Tower
Configure power transmission tower systems with voltage class, conductor specifications, and foundation design.
- Voltage class selection (110kV-1000kV)
- Conductor & ground wire specs
- Foundation type & design
- Total project cost breakdown
Smart Agriculture
Build precision agriculture monitoring systems with weather stations, soil sensors, pest detection, and cloud analytics.
- 7 monitoring module types
- Sensor quantity & coverage
- Cloud platform & data analytics
- Solar-powered LoRaWAN/4G connectivity
Certifications & Standards
Meeting international quality and safety standards
Latest Insights
Expert articles on solar energy, energy storage, and smart infrastructure

Power Transmission Tower Gothenburg Sweden — $3,120 Turnkey
A 25 m, 330 kV hybrid steel-FRP power transmission pole in Gothenburg is offered at $3,120 turnkey, with $2,028 FOB and $2,496 CIF. The 357 kg structure supports a 200 m span, 30 m/s wind, and 40-year life, delivering a 6.5-year payback and $480/year maintenance savings versus conventional towers.
Read More →
Telecom Tower in Ireland, Dublin — $31,909 Turnkey Case Stud
Verified case study of a SOLAR TODO 27 m monopole telecom tower in Dublin with 340 kg antenna load, 70 m/s wind rating and 21,265 kg steel weight. Three-tier pricing: $24,982 FOB, $28,450 CIF, $31,909 turnkey, delivering a 3.5-year payback for a single-site deployment.
Read More →
Designing High-Efficiency C&I Solar PV Systems
Guide for designing high-efficiency C&I solar PV (500 kW–10 MW) delivering 1,300–1,800 kWh/kWp/year and LCOE <$0.05/kWh. Covers module/inverter choices, DC/AC ratio 1.1–1.4, PR 80–88%, grid compliance, and ROI.
Read More →
Maximizing ROI with Industrial Solar PV Retrofits
Industrial rooftop PV retrofits can cut grid use 20–40%, deliver 1,100–1,600 kWh/kWp/year, and achieve 8–15% IRR. This article covers structural limits (0.15–0.25 kN/m²), electrical sizing (0.8–1.2 MWp/feeder), and monitoring (1–5 min data) to maximize ROI.
Read More →Ready to Start Your Project?
Get in touch with our team for a customized solution and competitive quote.