Solutions
Industry Solutions
AI-powered solutions for clean energy, smart cities, telecom infrastructure, and precision agriculture

A 21-tower, 45 m, 500 kV dead-end steel lattice transmission system in Lusail, Qatar is delivered by SOLAR TODO at $3,577,072 turnkey, with $2,325,097 FOB and $2,861,657 CIF options, achieving $715,414 annual savings, a 5-year payback, 400 m spans, and 50-year IEC 60826-compliant design life.

Case study of a 2,580-unit SOLAR TODO solar streetlight project in Milan’s highland zone: 30W, 4,500 lm poles with 7-day autonomy and 1,490 Wh LFP batteries. Turnkey cost is $608,550, delivering 706,275 kWh and 353,138 kg CO₂ savings per year with an 8.6-year payback over a 12-year lifespan.

Astana’s 210-pole SOLAR TODO solar streetlight project covers 5,040 m of road with 60W, 9,000 lm luminaires and 8 m poles. At a $89,783 turnkey price, it saves 114,975 kWh and $13,797 annually, achieves 7.8-year payback, and cuts CO₂ emissions by 57,488 kg each year over a 12-year lifespan.