Solutions
Industry Solutions
AI-powered solutions for clean energy, smart cities, telecom infrastructure, and precision agriculture

A 27m flanged sectional monopole deployed in Nicaragua delivered 45 m/s wind resistance, easier sectional transport, and a 25+ year corrosion-protection strategy. The case shows how SOLAR TODO reduced logistics risk while supporting scalable 4G/5G site rollout.

1MW commercial solar PV in Brazil: $1,808,800 turnkey CAPEX, 1,968,938 kWh/year, $0.033/kWh LCOE. Delivers $268,209 first‑year savings, 6.7‑year payback, 10.7% IRR, and avoids 827 tons CO₂ annually with single‑axis tracking and 22% mono modules.

SOLAR TODO’s verified 500kW commercial solar PV system in Korea is priced at $736,400 turnkey, with FOB $286,400 and CIF $315,985. Fixed-tilt (36.5°) monocrystalline modules and string inverters provide a bankable, grid-tied C&I solution optimized for KR conditions.